A fool-proof quality management system
To ensure that every project we do for you is structured and coordinated for maximum efficiency, NNE Pharmaplan has developed a unique phased quality management approach. We call it PAM, or the Project Activity Model – and it is the key to every flawless project execution.
PAM is a project-centred approach that integrates project management, procurement, quality management and engineering management into every engineering discipline – so we can conceptualise, design and build a complete pharmaceutical facility.
PAM supports the entire project lifecycle, from building infrastructure and integrated-automation process equipment to construction, commissioning and qualification services.
An essential part of project scoping, PAM allows us to ensure that all project steps are in place, well-defined and structured at the outset. It contains distinct structures and phases, facilitating multi-disciplinary integration with our client’s project models and project organisations, and integrating them with those of our partners, contractors and suppliers.
A foundation that meets the toughest standards
Continually updated to reflect the latest best practices and guidelines, PAM incorporates recognised international standards and models, such as:
- The Project Management Institute’s standards
- ISO lifecycle models for process plant engineering
- ISPE guidelines for pharmaceutical facilities
- ISPE/GAMP guidelines
- CMMI lifecycle model for process and plant automation projects
An essential overview and total transparency
PAM provides ever person involved in a project with guidelines and a detailed project overview, ensuring an uninterrupted and fully transparent project flow.
PAM also allows our clients to easily access all project milestones, as well as keep track of our progress and activities at all times. Whenever the project requires the client’s special attention or approval, the PAM points out exactly what needs to be done, when and by whom.